DIY Bathroom Deux: Gets Worse Before it Gets Better

Our second bathroom renovation is going swimmingly. Not only was there less to do in this bathroom, it may not appear that way but  nothing has to be done to the shower area this time. Also since it is going to be very similar to my master bath, a lot of the choices have already been made. So we could get right in and start working. However, as with all projects things often look a lot worse before they start looking better.

image image_1

image_2

But things are already looking up. I ordered the counter top and it came in record time, we got it installed fairly easily having learned from the last bathroom. The mirror is ready and waiting to be put back up. We swapped out the electrical outlets and switches.

image_3

This weekend paint is going up and hopefully the new light fixtures will get installed. I am also doing some work to my office, I finally have the last component to finish off the room so I should have a post about that soon.

 

 

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s